loading
Castalian Springs, TN 37031
24 Hours/Day | 7 Days/Week
Castalian Springs, TN 37031
24 Hours/Day | 7 Days/Week
Post Image
22 Jul, 2022
Posted by Admin
0 comment

Installing WRTR Receptacles – Is it necessary?

This week we have a service call to move a receptacle on a boat dock. This is both a wet and damp environment, so let’s see what we need to do for this job.

SPONSOR:
Save 10% off your first order – https://bit.ly/2E61Mh6
Dustin’s Favorites – https://bit.ly/3hDGq8G

🤘⚡️MEMBERSHIP⚡️🤘
JOIN ELECTRICIAN U – become a member and get:
FREE Continuing Education every year
FREE Practice Exams
FREE Monthly Video Courses
FREE Monthly Educational News Letter
Premium Members-Only Content
Private Discord Channel
Monthly Members-Only Discord Chats
Sign up here — https://www.electricianu.com/

✍️👨‍🎓LIVE CLASSES👨‍🎓✍️
https://www.electricianu.com/live-online-electrical-classes/

👾🤖PRACTICE EXAMS🤖👾
https://electricianu.com/electrician-practice-exams-national-electrical-code/

😎👕MERCH👕😎
https://electricianu.com/eu-merch/

📲👥SOCIALS👥📲
Instagram – https://www.instagram.com/electrician_u
Discord – https://discord.gg/electricianu
Facebook Page – https://www.facebook.com/theelectricianu
Facebook Group – https://bit.ly/2tz7eQh
TikTok – https://www.tiktok.com/?electricianu />Reddit- https://www.reddit.com/r/ElectricianU/
Twitter – https://www.twitter.com/electrician_u
LinkedIn – https://linkedin.com/company/electricianu

🎧🎹MUSIC AND VIDEO:🎹🎧
https://www.facebook.com/descantmv

🎬✍️ART AND ILLUSTRATION:✍️🎬
https://www.daverussoart.com

The first thing I needed to do after disconnecting power, was to disassemble the existing circuit. This meant opening up a junction box in the structure and taking apart the existing wiring and conduit. I also had to remove an old bell box and receptacle that was attached, as the customer wanted it moved to a different location.

Next, I had to install a new bell box at the new outlet location using self-drilling screws into the steel post nearby. Now in order to get wire from the junction box to the new receptacle, I had to run conduit. The easiest thing to do for the location was to pre-wire a “whip” made out of carflex, measure it and cut it to size. This way I could install the entire conduit system and wire at the same time, rather than trying to install metal conduit, with couplings connectors, and tons of bends. This saved a ton of time.

Once I got the next conduit and wire in place I hooked up both ends, installed a new WRTR receptacle, and in-use cover, closed everything up, re-energized the circuit, and tested with my plug tester. I ensured that this receptacle was on a GFCI circuit, cleaned up, and walked away. On to the next job.

#electrical #wrtr #wiring

Leave a Comment

Your email address will not be published.*

Recent Comments

No comments to show.

Categories

Archive

July 2022
M T W T F S S
 123
45678910
11121314151617
18192021222324
25262728293031

Recent Posts

SHORT – How to Install Recessed Cans
05 Jul, 2022

SHORT – How to Install Recessed Cans

Here’s how to install Recessed Cans in under 5 minutes! 00:00 In

How to Organize and Label Your Code Book!!!
05 Jul, 2022

How to Organize and Label Your Code Book!!!

As we all know, the NFPA 70 (aka NEC code book!) is quite full of a TO